This is a weir skimmer that has the capacity to recover large volumes of fluid at high rates using an integrated pump. It is typically deployed in open, coastal or near-shore waters.
Locations of Stress I Skimmers
Site | Quantity (Each) |
---|---|
Astoria, OR | 1 |
Chesapeake City, MD | 1 |
Chesapeake, Virginia | 2 |
Fort Jackson, LA | 1 |
Galveston, TX | 1 |
Grand Isle, LA | 1 |
Ingleside,TX | 1 |
Lake Charles, LA | 2 |
Long Beach, CA (Berth 57) | 1 |
Miami, FL | 1 |
Neah Bay, WA | 1 |
Oahu, Honolulu, HI, Pier 15 | 1 |
Pascagoula, MS | 1 |
Perth Amboy, NJ | 1 |
Portland, ME | 1 |
Portland, OR, Kinder Morgan Willbridge Terminal | 1 |
Richmond, CA (Richmond PPS) | 1 |
Savannah, GA | 1 |
St. Croix (LTB) | 1 |
Tampa, FL | 1 |
Total: | 22 |